To get an accurate crane retrofit quote, you need to provide the crane brand and model, the current rated capacity and boom configuration, details of any existing safety systems already installed, the operating environment, and a clear description of what the retrofit should achieve. The more complete the information you supply upfront, the faster we can assess compatibility and propose the right solution.

At PAT-Krüger, we manufacture the DS130 and DS430 safe load indicator platforms, which are designed as direct replacements for a wide range of legacy systems across dozens of crane brands. This article walks through each piece of information we need and explains why it matters for your retrofit inquiry.

What type of crane needs the retrofit?

The crane type determines which sensors, displays, and control architectures are compatible with a retrofit solution. We need to know the crane brand, model designation, and the general category of crane involved, whether that is a mobile crane, crawler crane, offshore pedestal crane, ship-to-shore crane, or knuckle boom crane. Each type has different structural and electrical requirements.

Brand information is especially important because we maintain a compatibility database covering systems installed across a large number of crane manufacturers. For example, we have supplied retrofit solutions for cranes built by Liebherr, Manitowoc, Tadano, Demag, Fassi, Palfinger, Kobelco, Sany, ZPMC, and many others. Knowing the brand immediately tells us which legacy system is likely installed and which replacement path applies.

If you are unsure of the exact model designation, a photograph of the crane nameplate and the existing control console is a practical starting point. Even partial information helps us narrow the options before a formal site assessment.

What is the crane’s current rated capacity and configuration?

The rated capacity and boom configuration define the load range the safety system must monitor and the number of input channels the replacement unit needs to handle. We need the maximum rated load in tonnes, the boom type (for example, lattice, telescopic, or knuckle), the number of boom sections, and whether the crane operates with single or multiple reeving configurations.

For cranes with luffing jibs, fly jibs, or auxiliary hooks, each working configuration may require a separate load chart to be programmed into the replacement system. The DS130 safe load indicator and DS430 safe load indicator support multiple load charts, but we need to know how many configurations are in active use to size the solution correctly.

Capacity also affects sensor selection. A crane rated at a few tonnes and a crane rated at several hundred tonnes require different force sensors in terms of range, output signal, and mechanical interface. Providing the rated capacity upfront prevents mismatches later in the process.

What existing safety systems are already installed?

Identifying the legacy system already on the crane is the single most important step in a retrofit inquiry. The installed system tells us the sensor types, wiring standards, and display interfaces that are currently in place, and determines how much of the existing infrastructure can be reused.

Common legacy systems we replace include the DS350G, DS350C, DS100, PRS145, AS110, PDC, ECIS, and iFlex series, among others. If your crane carries one of these, the DS130 safe load indicator or DS430 safe load indicator is a proven replacement path. In some cases, additional compatibility with systems such as the M4E/2, I2 System, or Maestro also applies depending on the crane brand.

If the original force transducers or sensors are no longer available as spare parts, a retrofit can still proceed. We have completed projects where a crane built in the late 1990s was brought back into full service by replacing the weighing system with a DS130 controller and modern 4 to 20 mA force sensors, because the original transducers could no longer be sourced. Providing the system model number, or a photograph of the existing display unit and sensor labels, gives us everything we need to confirm the replacement path.

What operational environment does the crane work in?

The operating environment determines the ingress protection rating, temperature range, certification requirements, and cable specifications for the replacement system. A crane working in a covered warehouse has very different requirements from one operating on an offshore platform or in a classified hazardous area.

Key environmental factors to communicate in your inquiry include:

  • Onshore or offshore location
  • Whether the area is classified as ATEX, IECEx, or UL hazardous zone
  • Ambient temperature range at the installation site
  • Exposure to salt air, water spray, or corrosive atmospheres
  • Whether the crane operates in tropical, arctic, or desert conditions

For offshore and hazardous area installations, ATEX certification of the sensors and display units is a mandatory requirement, not an optional upgrade. We design and supply ATEX-certified systems and can confirm the applicable certification scope for your site. Providing the area classification documentation or the site hazardous area drawing at the inquiry stage avoids delays in the engineering phase.

What specific functions or problems should the retrofit solve?

A retrofit quote cannot be scoped accurately without a clear description of what the new system must do or what problem it must resolve. Common retrofit objectives include replacing a failed or unsupported display unit, restoring load moment indicator functionality after sensor failure, adding data logging capability, integrating anti-collision logic, or meeting a new regulatory or classification requirement.

Describing the problem in plain terms is sufficient. For example, stating that the load display is no longer functioning, that spare parts for the existing system are unavailable, or that the crane needs to pass a recertification inspection gives us a clear engineering brief. We do not need a formal specification document at the inquiry stage.

If the goal is to add functions that were not present on the original system, such as remote monitoring, wind speed logging, or CCTV integration, noting these requirements upfront allows us to include the relevant modules in the initial proposal rather than adding them as amendments later. Our system integration capability covers turnkey safety and control solutions, so multi-function retrofits are handled within a single scope of work.

What documentation should be provided with a retrofit inquiry?

Supporting documentation accelerates the quotation process significantly. The most useful documents to include with a retrofit inquiry are the crane’s original load chart, the existing system’s wiring diagram or schematic, the sensor data sheets if available, and any inspection or survey reports that describe the current condition of the installation.

If formal documentation is not available, photographs are a practical alternative. Clear photographs of the existing display console, the sensor mounting points, the junction box interior, and the crane nameplate provide enough information for a preliminary compatibility assessment. For ZPMC ship-to-shore cranes, for example, we have replaced DS120 systems with DS130 systems, and having the original system drawings significantly shortened the engineering review.

You do not need to have all documentation ready before making contact. We can guide you on what to gather once an initial conversation has taken place. Our field service team can also conduct an on-site survey if documentation is incomplete or the installation is complex.

How does site accessibility affect the retrofit quote?

Site accessibility directly affects the installation cost and lead time in a retrofit quote. Factors such as crane location, working-at-height requirements, permit-to-work procedures, offshore mobilisation logistics, and local labour regulations all influence how the installation is planned and priced.

For cranes located at remote or offshore sites, mobilisation of our installation engineers requires advance planning around vessel schedules, helideck access, or road transport to site. For cranes in operational port environments, the available maintenance window and crane downtime restrictions shape the installation sequence.

Providing the following details helps us build an accurate installation estimate:

  • Geographic location of the crane or site
  • Whether the site is onshore, nearshore, or offshore
  • Estimated working-at-height requirements and available access equipment
  • Planned maintenance windows or permissible downtime periods
  • Any site-specific safety induction or permit requirements for contractors

An obsolete or failing safety system does not mean the crane has reached the end of its service life. The steel structure of a crane can remain fully operational for many years beyond the lifespan of its original electronics, and upgrading the control and safety systems to current technology is a practical and cost-effective alternative to crane replacement. The DS130 and DS430 platforms are designed precisely for this purpose, restoring full load moment indicator and safe load limiter functionality with current hardware and software.

If you are ready to discuss a replacement for your existing system, contact PAT-Krüger with the information outlined above and we will assess the best retrofit path for your crane. You can also explore the DS130 and DS430 platforms to understand the capabilities of our current safe load indicator range.