Yes, the DS130 safe load indicator can combine load monitoring and anti-collision in a single integrated crane safety system. Both functions run on the same controller, share the same display, and can trigger crane motion cutouts independently or simultaneously. This makes the DS130 crane control platform a practical choice for crane owners who need both capabilities without fitting two separate systems.
The sections below answer the most common technical questions about how these two functions work together inside the DS130, what hardware is involved, and whether the system suits offshore or hazardous-area installations.
What functions does the DS130 system actually perform?
The DS130 safe load indicator is a multi-function crane safety and control system. Its core role is to prevent overloading by calculating the actual load against the crane’s rated capacity, but the same platform also supports anti-collision zone management, data logging, and remote monitoring. It is also referred to as a rated capacity indicator or load moment indicator depending on the region and crane type.
In practical terms, a single DS130 installation can cover:
- Continuous load monitoring and overload protection
- Boom angle and length measurement
- Working radius calculation
- Anti-collision and zone-limiting functions
- Data logging of operational parameters
- Remote data access via secure connection
- Integration with anemometers and wind speed sensors
Because all of these functions share one controller and one operator display, the DS130 crane control system reduces the number of separate black boxes in the cab and simplifies maintenance. For crane owners replacing a legacy system, this consolidation is one of the clearest practical benefits of the upgrade.
How does load monitoring work inside the DS130?
Load monitoring inside the DS130 safe load indicator works by reading live signals from force sensors, then comparing the calculated load moment against the crane’s rated capacity chart stored in the system’s memory. When the actual load approaches the rated limit, the system issues a warning. If the limit is reached, it triggers an automatic motion cutout to stop the crane from travelling further into an unsafe condition.
The DS130 reads input from load pins, load cells, pressure transducers, or strain gauge sensors depending on the crane type and configuration. The controller calculates the load moment using boom angle, boom length, and measured force simultaneously. This means the system accounts for the geometry of the lift, not just the raw hook load, which is the correct basis for a load moment indicator or rated capacity indicator.
The rated capacity chart for the specific crane is programmed into the DS130 during installation. We configure the system to match the crane manufacturer’s original capacity tables, including any variation between different boom configurations or reeving arrangements. This is especially important on cranes with telescoping booms or luffing jibs, where the safe working load changes significantly across the working range.
For retrofit applications, the DS130 can accept signals from modern 4 to 20 mA force sensors, which is relevant when original force transducers from an older system are no longer available. We have completed installations where a crane built in 1998 was brought back into full service by pairing a DS130 controller with updated sensors of this type, without replacing the crane structure itself.
How does the DS130 anti-collision system detect conflicts?
The DS130 crane anti-collision system detects conflicts by continuously tracking the position of each crane relative to defined exclusion zones or other cranes on the same site. The system uses boom angle, slew angle, and boom length data to calculate the crane’s envelope in real time. When that envelope approaches a restricted boundary, the system warns the operator and can cut out the relevant crane motions before a collision occurs.
There are two main scenarios the anti-collision function handles. The first is zone limiting, where the crane is prevented from entering a fixed area such as a building, a live electrical line, or a restricted deck zone. The second is crane-to-crane anti-collision, where two or more cranes working in overlapping areas are monitored together so that neither can travel into the space occupied by the other.
The DS130 exchanges positional data between cranes using a dedicated communication link. Each crane’s controller knows the current position of the others and calculates the risk of conflict continuously. This approach is more reliable than simple mechanical stops because it adapts to the actual geometry of the lift rather than relying on fixed physical limits.
For sites with multiple cranes, we can configure the anti-collision function across the entire fleet through our system integration service, ensuring all units communicate correctly and that zone boundaries are set to match the actual site layout.
What happens when load monitoring and anti-collision trigger simultaneously?
When both load monitoring and anti-collision functions trigger at the same time inside the DS130, both cutout signals are active simultaneously and the crane’s motion controls respond to whichever restriction applies to each movement. The two functions are independent in their detection logic but share the same output relay system, so there is no conflict between them at the hardware level.
In practice, this means the operator receives warnings from both functions on the same display, and the crane is stopped from any motion that either function has flagged as unsafe. The operator can see the reason for each restriction clearly, which helps avoid confusion in a situation where, for example, the load is near its rated limit at the same moment the boom is approaching a zone boundary.
This integrated behaviour is one of the reasons combining both functions in a single DS130 crane safety system is preferable to running two separate systems in parallel. With two independent systems, there is a risk that output signals conflict or that the operator receives confusing information from two separate displays. The DS130 resolves this by design.
What sensors and hardware does the DS130 integrate with?
The DS130 safe load indicator integrates with a wide range of sensors and peripheral hardware, including load pins, compression load cells, pressure transducers, angle sensors, length encoders, slew encoders, anemometers, and anti-two-block switches. The system accepts both analogue signals such as 4 to 20 mA and digital inputs, which gives it broad compatibility with sensors from different manufacturers and different eras of crane equipment.
For the anti-collision function specifically, the DS130 uses slew angle encoders and boom angle sensors to track crane position. These can be newly supplied sensors or, in many cases, the existing sensors already fitted to the crane if they meet the signal requirements.
We supply a full range of compatible heavy-duty parts including load pins, load cells, and angle sensors that are matched to the DS130 platform. Where a crane’s original sensors are no longer serviceable, we can fabricate replacement sensors to the required capacity and form factor, including ATEX-certified variants for hazardous area installations.
The DS130 also connects to CCTV systems, remote monitoring modules, and data logging hardware, allowing it to act as the central hub for the crane’s entire safety and control architecture rather than a standalone instrument.
Is the DS130 suitable for offshore and ATEX environments?
The DS130 crane control system is suitable for offshore environments and can be configured for ATEX-classified hazardous areas. Offshore installations require equipment that withstands salt air, vibration, and demanding duty cycles, and the DS130 is designed with these conditions in mind. For ATEX zones, the system can be paired with ATEX-certified sensors, junction boxes, and barriers to meet the requirements of the installation.
We hold relevant certifications for our systems and sensors. For specific certification details applicable to a particular installation, our certifications page provides current documentation, and our engineering team can confirm suitability for a specific zone classification during the project assessment.
Offshore crane retrofits are a common application for the DS130. Ship-to-shore cranes, offshore pedestal cranes, and deck cranes on vessels all present the same fundamental challenge: the crane structure is sound, but the safety electronics have aged beyond reliable service. Replacing the control system with a DS130 allows the crane to continue working without the cost and disruption of a full replacement. We have completed DS130 installations on ship-to-shore cranes, including two ZPMC cranes where legacy DS120 systems were replaced with DS130 units.
How is DS130 data logged and accessed remotely?
The DS130 crane safety system logs operational data locally on the controller and can transmit that data to a secure private cloud for remote access. Logged parameters typically include load values, boom angle, working radius, alarm events, and wind speed where an anemometer is connected. This data can be accessed through a Windows application or a mobile app, depending on the configuration.
Remote access is useful for technical managers and service engineers who need to review crane performance or investigate an alarm event without travelling to the site. It also supports planned maintenance, because the logged history shows how the crane has been operated over time and whether it has approached its limits regularly.
The wireless range for local data transmission reaches up to 1,000 metres, which is sufficient for most yard and port environments. For sites where a continuous cloud connection is preferred, the DS130 can log to the cloud in real time through the remote monitoring module.
Our field service team can configure the data logging and remote access setup during installation and provide support if the configuration needs to change after commissioning. This is particularly relevant for multi-crane sites where a central overview of all crane activity is needed.
If your crane is currently running an older safety system and you want to understand whether the DS130 is a suitable replacement, contact us at PAT-Krüger to discuss your specific crane type and installation requirements. The crane structure does not need to be replaced. In most cases, only the electronics do.
Related Articles
- Can offshore cranes be retrofitted with a DS130?
- Can't get manufacturer support for your crane system anymore? Here's why
- Are There Retrofit Systems for Faun PDC?
- Can marine safety systems be remotely monitored?
- The Surprising Truth About Loadpin Technology: Why It's Revolutionizing Industrial Safety Standards