Can a crane control system be retrofitted on site anywhere in the world?

Yes, a crane control system can be retrofitted on site, virtually anywhere in the world. The crane’s steel structure stays in service while the electronics, sensors, and software are replaced with current technology. This article answers the practical questions that crane owners, technical managers, and service engineers ask most often before scheduling a retrofit.

What does retrofitting a crane control system actually involve?

A crane control system retrofit means removing the existing safe load indicator, load moment indicator, or rated capacity indicator and replacing it with a modern equivalent, while the crane itself remains in place. The structural components of the crane are not touched. Only the electronics, sensors, display units, and control software are upgraded.

In practical terms, a retrofit typically covers the following elements:

  • Replacing the central controller or console with a current-generation unit such as the DS130 safe load indicator or DS430 load moment indicator
  • Replacing legacy force sensors, load cells, load pins, or pressure transducers with calibrated modern equivalents
  • Updating angle, length, and boom angle sensors where required
  • Installing new display and operator interface hardware
  • Loading or developing crane-specific software with the correct capacity charts
  • Commissioning, testing, and calibrating the complete system on the crane

The goal is to restore full functionality: the crane operates with the same safety envelope it was originally designed for, but with hardware and software that is current, supportable, and compliant with today’s standards. In one example, a crane built in 1998 was brought back to full operational status by upgrading its weighing system with a DS130 controller and modern 4…20 mA force sensors, because the original force transducers were no longer available as spare parts. The steel structure needed nothing. Only the measurement and control layer changed.

We carry an extensive database of crane configurations built up over decades of installations worldwide. This means the capacity charts, boom configurations, and sensor parameters for many crane models are already on file, which significantly reduces engineering time during a retrofit.

Which crane types and makes can be retrofitted with a new control system?

A wide range of crane types and brands can receive a crane control system retrofit, including mobile cranes, crawler cranes, lattice boom cranes, knuckle boom cranes, ship-to-shore cranes, offshore cranes, and tower cranes. Compatibility depends on the existing system fitted to the crane, not solely on the crane brand.

The DS130 safe load indicator and the DS430 load moment indicator serve as the primary replacement platforms for a large number of older systems across many crane manufacturers. The following brands and their associated legacy systems are within our documented retrofit scope:

  • American Hoist cranes fitted with AS110, DS350G, DS100, or PRS145/M4E/2 systems
  • Cargotec cranes fitted with DS350G, DS100, or PRS145 systems
  • Caterpillar cranes fitted with DS350G, DS100, or PRS145 systems
  • Demag cranes fitted with DS350G, DS350G/C, DS100, PRS145, PDC, or ECIS systems
  • Effer cranes fitted with AS110, DS350C, DS350G, DS100, or PRS145 systems
  • Fassi cranes fitted with AS110, DS350C, DS350G, DS100, PRS145, or PRS85 systems
  • Faun cranes fitted with AS110, DS350C, DS350G/C, PDC, or iFlex5 systems
  • Liebherr cranes fitted with AS110, DS350C, DS350G, DS85/KD, DS100, PRS145, or ECIS systems
  • Manitowoc cranes fitted with AS110, DS350C, DS350G, DS100, PRS145, or PRS85 systems
  • Tadano cranes fitted with AS110, DS350C, DS350G, DS100, PRS145, ECIS, iFlex2, or iFlex5 systems
  • Sennebogen cranes fitted with DS350C, DS350G, DS100, PRS145, PDC, iFlex2, or iFlex5 systems
  • ZPMC ship-to-shore cranes fitted with PDC/DS120 systems

Additional brands within our retrofit scope include Gottwald, Hitachi, Kobelco, Komatsu, Kone, Locatelli, Marathon LeTourneau, NPCC, P&H, Palfinger, Sany, Sormec, Sumitomo, XCMG, Zoomlion, DG Crane, Fushun, and Plimsoll, depending on the system currently installed. Two DS120 systems on ZPMC ship-to-shore cranes have been replaced with DS130 systems as a direct example of this process in practice.

If your crane brand or current system is not immediately recognisable from this list, contact us directly. Our systems database covers a broad range of configurations, and compatibility can often be confirmed quickly.

Does a retrofitted crane control system meet international safety standards?

Yes. A retrofitted crane control system supplied and installed by the original equipment manufacturer is engineered to meet the relevant international safety standards applicable to the crane type and operating region. The replacement system is not a generic aftermarket device; it is designed specifically for the crane’s rated capacities, boom geometry, and operating modes.

The DS130 and DS430 platforms are the current-generation systems in our product line. Relevant certifications and approvals are documented and available for review. For offshore and hazardous area applications, ATEX certification is a key requirement, and our systems and sensors are available in ATEX, IECEx, and UL certified variants where required. You can review our certification documentation for specific approvals.

Compliance is not only about the hardware. It also depends on correct commissioning, calibration, and the accuracy of the crane’s capacity charts loaded into the system. We carry out full on-site commissioning and calibration as part of every retrofit installation, which is what allows the system to meet the applicable standard in practice, not just on paper.

How long does an on-site crane control system retrofit take?

The duration of an on-site crane control system retrofit depends on the crane type, the complexity of the existing installation, and the scope of work required. A straightforward replacement of a display and controller unit on a mobile crane can be completed in one to two days. A more complex retrofit involving multiple sensor replacements, new cabling, and full recommissioning on a larger crane takes longer.

Several factors influence the total time on site:

  • Whether existing sensor wiring and cable runs can be reused or need replacement
  • The number of crane functions being monitored (single hoist versus multiple hoists, luffing, slewing, outrigger monitoring)
  • Access conditions on the crane and at the installation site
  • Whether crane-specific capacity charts are already on file or need to be developed
  • Local permit and inspection requirements before the crane returns to service

Because we hold an extensive database of crane configurations, the engineering preparation before arrival on site is often already well advanced. This reduces surprises during installation and keeps the crane out of service for the shortest practical period.

Can a crane control system be retrofitted in remote or offshore locations?

Yes. We provide crane control system retrofit and installation services at remote and offshore locations worldwide. Our field service team is equipped to work on offshore platforms, vessels, remote construction sites, and port facilities in any region. The work is carried out by engineers experienced in the specific challenges of these environments.

Offshore and remote retrofits require additional planning compared to a workshop or yard installation. Key considerations include:

  • Logistics for shipping equipment and spare parts to the location in advance
  • Compliance with offshore safety and access requirements
  • ATEX certification of the control system and sensors where the crane operates in a hazardous area
  • Communication and remote support capability if additional engineering input is needed during installation
  • Coordination with the asset operator’s maintenance windows to minimise crane downtime

Our remote monitoring capability also means that after a retrofit, the system can be accessed and reviewed from shore via a secure private cloud connection, which supports ongoing maintenance and fault diagnosis without requiring an engineer to travel to the asset for every query.

What should you check before scheduling a crane control system retrofit?

Before scheduling a crane control system retrofit, you should confirm the crane make and model, identify the exact system currently installed, assess the condition of existing sensors and cabling, and verify what documentation is available for the crane. This information allows the retrofit to be scoped accurately and avoids delays once work begins on site.

A practical pre-retrofit checklist covers the following:

  1. Identify the existing system: Note the system name, model number, and any visible serial numbers on the controller, display, and sensors. Names such as DS350G, PRS145, AS110, PDC, ECIS, or iFlex refer to specific platforms that determine which replacement path applies.
  2. Confirm the crane’s rated capacity and boom configuration: The replacement system must be programmed with the correct capacity charts. If the original crane manual or load chart is available, gather it.
  3. Assess sensor and wiring condition: Check whether existing load pins, load cells, angle sensors, and cable runs are in serviceable condition or need replacement alongside the controller.
  4. Check power supply and panel space: Confirm the available power supply voltage and whether there is sufficient space in the control panel for the new hardware.
  5. Review site access and safety requirements: For offshore or hazardous area installations, confirm ATEX requirements, access permits, and any operator-specific safety induction requirements.
  6. Establish the maintenance window: Agree on the period the crane can be taken out of service, and ensure spare parts and equipment can be on site in time.

An older or legacy system does not mean the crane must be taken out of service permanently or replaced entirely. The steel structure of a crane has a working life that far outlasts the electronics fitted to it. A crane control upgrade replaces only the layer that has become obsolete, restoring the asset to full operational and safety compliance without the cost of a new crane.

If you are ready to discuss a replacement for your existing system, contact PAT-Krüger with the details of your crane and current installation. We will confirm compatibility and outline the retrofit options available to you.